De Zilk
Zilkerduinweg

De Zilk, Zilkerduinweg

Combination of kerb and line drainage provides a stable road.

Line drainage adds a design element to the infrastructure. The non-clattering monolithic structure in combination with the anthracite black color scheme create a quiet and peaceful appearance.

Line drainage provides a very gradual drainage of the infrastructure.

HOW DID IDS SUPPORT THIS PROJECT?

In collaboration with the contractor Versluys, the technical department employees of IDS Group provided the sketch design, the hydraulic calculation and the specifications. During the project, IDS provided support in terms of advice on the implementation of the project.

Attributes OF THIS PROJECT

  • Line drainage was used in this project as well as kerbs
  • The IDS line drainage has a length of 800 meters;
  • On this road there are many entrances so stability is the key. Through the use of materials IDS drainage products can respond to this.