More economical and quicker to implement design in contaminated soil resulted in contractor's profit
PDV Belvédère Maastricht

PDV Belvédère Maastricht

More economical and quicker to realize design with contaminated soil resulted in profit for contractor.

The original plan consisted of Ø1000 concrete infiltration pipes and pits and all drainage would be done via point drainage/ gullies. IDS-Group offered an alternative, the Rausikko SX infiltration system with drainage kerbs.

Because of the convenience for the store owner (no unpleasant bumps) and the fast application possibilities, this system was chosen.

The entire drainage system is provided with 550 meters of drainage strips.

HOW DID IDS SUPPORT THIS PROJECT?

IDS's skilled technical staff provided the drawings for the integration of the infiltration systems and band drainage for contractor Bloem Infra. By realizing this cost-effectively and quickly, Bloem Infra accepted the contract. IDS also provided instructions to the tradespeople and the superintendent at the start of the installation.

ADVANTAGES OVER REGULAR DRAINAGE

  • The concept of IDS works without pipes and gullies in the courtyard;
  • No subsidence caused by manholes or gullies;
  • Greater convenience for the shopper (no unpleasant bumps);
  • Return rainwater to the subsurface;
  • One maintenance point per crate system;
  • Quickly applicable solution for contaminated soil.