Attributes of the project
In collaboration with the contractor and the engineering firm, IDS drew the plastic structure in 2D and 3D. Due to the clear drawings and efficient communication between them, this resulted in a saving of approximately 25.000 euros.
In only 8 cargo loads and 8 unloading movements with the on-site crane, this complete buffer was placed and welded together in 2 days. Because of its light weight, the structure can be placed quickly and efficiently (3500-5000 kg per 17 ml length).