Weholite large pipe
St.Geertruid (NL), reconstruction wolfsstraat

St. Geertruid - weholite large pipe

Limited space for storage sedimentation pipe solved with cost-saving construction.

  • IDS helped to realize a mountain sedimentation pipeline at very short notice;
  • 30-40% cost savings;
  • The Weholite Winding Pipe weighs only 5 tons per 19.7 meters. This gave many advantages during installation.

ADVANTAGES OVER REGULAR DRAINAGE

  • Up to 75% less use of space. By the way, the dimensions of concrete were not possible in this area;
  • As much as 8 times lighter weight than regular concrete construction.

HOW DID IDS SUPPORT THIS PROJECT?

The technical department of IDS Group, together with engineering firm Kragten and the manufacturer, engineered the innovative solution and worked it out in 2d and 3d drawings. Because of this support, the implementation in 2019 was possible and the Mountain Sink Pipe could be realized with a cost-effective construction.