Limited space for storage sedimentation pipe solved with cost-saving construction.
The technical department of IDS Group, together with engineering firm Kragten and the manufacturer, engineered the innovative solution and worked it out in 2d and 3d drawings. Because of this support, the implementation in 2019 was possible and the Mountain Sink Pipe could be realized with a cost-effective construction.
More information about this project or interested in starting one?
Get in touch with us!