PP pipes, inline manholes ΓΈ1000-1200mm
Landgraaf (NL)

Kasteelweg municipality Landgraaf

Characteristics of the project

  • 2 in 1 solution
  • Integration of the pit construction in the HDPP 1000 - 1200 mm pipes
  • Little space in the center for installation
  • Longer stay/storage of the sewage water
  • 6 meter long pipes

ADVANTAGES OVER CONCRETE

  • Less space usage
  • 1 meter compensated by the wells
  • 10% lighter than concrete construction
  • faster delivery times (2-3 weeks)

impressions

More information?

More information about this project or interested in starting one?

Then get in touch with us!

Contact