How can you keep a large area as flat as possible and infiltrate rainwater as high as possible? IDS offered the solution.
By integrating drainage and infiltration into the IDS drainage kerbs, we were able to start infiltration at a very high level (from 10 cm below ground level) in combination with the lava package. The lava pack ensures that PAHs, among other things, do not end up in the subsurface. During the construction, the inner courtyard remained completely untouched, which made it possible to lay a much tighter road surface.
In collaboration with the engineering firm, IDS detailed the drainage system in the drainage drawing. Before the kerbs were installed, IDS gave instructions on how to process and install the products.