Benefits during this project due to integration drainage system IDS Group.
In cooperation with the municipality and the engineering firm, IDS worked out the kerb in the technical drawing. Before the tires were installed, IDS gave instructions to the tradesmen and the contractor on how the products should be processed and installed.
By integrating the drainage into the drainage bands, this street could be renovated with only 60 cm of excavation. In practice, this resulted in the closure of only one road segment. The center of the city and the bus stops remained accessible.